Demo Flight AcademyDemo Flight Academy

Demo school. A sample flight school with four aircraft and two years of invented flights and bills (September 2024–August 2026). Sign in to see your own school's numbers.

N8123VPiper PA-28-181 Archer IIIActive

Piper PA-28-181 Archer IIILeaseback

Rank 3 of 4 by operating margin

Jan 1, 2026 – Oct 20, 2026

2026-01-01 to 2026-10-20

to
Revenue
$88,305
−12%vs. previous period
Hours flown
504.6
−12%vs. previous period
Revenue/hr
$175
0%vs. previous period
Utilization
17.5%
−2 ptsvs. previous period

Monthly performance

May–Oct, by calendar month; Oct to the range's end.

Upcoming inspections

Maintenance
Due dateItemHours / intervalStatus
Dec 1, 2026estNext 100-hour40.0 hours to go
60% of the way
In 42 days
Jan 31, 2027Next annual12 calendar months
73% of the way
In 103 days
March 2030estOverhaul1,120.0 hours to the 2,000-hour TBO
44% of the way
In 1237 days

Aircraft information

Make / model
Piper PA-28-181 Archer III
Ownership
Leaseback
Engine TBO
2,000 hrs
Engine hours since overhaul (SMOH)
880 hrs (entered Aug 31, 2026)
Current tach
4126.5
Overhaul cost
$42,000
Hourly rate
$175/hr
Fuel burn
Not set

What the numbers show

Cancellations are costing N8123V real flying time.

N8123V$8,400 est Scheduled value of cancelled hours

7% of bookings were cancelled or no-shows, 48.0 scheduled hours worth about $8,400 at the usual rate.

Ideas schools in this spot often explore

  • What's different about the bookings of the instructor on most of them: students, times, or workload.
  • How the cancellation and no-show policy is set: notice period, fees, and whether it's applied consistently.
  • Reminders before each booking, and how easy it is for a student to move a booking instead of dropping it.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N8123V had 24 cancelled or no-show bookings (7% of its 368 bookings) covering 48.0 scheduled hours; its revenue per hour was $175.00.

Cancelled or no-show bookings: 24
Cancellation rate: 7%
Scheduled hours: 48.0 h
Revenue per hour: $175.00/hr
Cancelled or no-show bookings: 24
Cancellation rate: 7%
Scheduled hours: 48.0 h
Revenue per hour: $175.00/hr

Facts from your data, not a diagnosis.

  • One instructor was on 6 of the 12 cancelled or no-show bookings that name an instructor. smaller factor
    With the same instructor: 6
    Naming an instructor: 12
  • 20 of the 24 cancelled or no-show bookings that name a customer were booked again by the same customer within 7 days. main factor
    Booked again: 20
    Naming a customer: 24
    Rebooked share: 83%

N8123V's next inspection falls in the same two weeks as other aircraft's.

N8123V flew 32% of the fleet's hours, and the others are due within days of it, so they could all be down at once.

Ideas schools in this spot often explore

  • Bringing one inspection forward a few days so the aircraft aren't down at the same time.
  • Whether the shop can take two aircraft in the same week, and how long each would take.
  • Which bookings fall in those weeks and could move to other aircraft.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N8123V's 100-hour (about Dec 1, 2026) falls within 14 days of N744PS's 100-hour (about Nov 30, 2026) and N744PS's annual (due by Nov 30, 2026) (projected). N8123V flew 32% of the fleet's hours from 2026-07-23 to 2026-10-20.

N8123V 100-hour: about Dec 1, 2026
Also due: N744PS 100-hour: about Nov 30, 2026
Also due: N744PS Annual: due by Nov 30, 2026
N8123V share of fleet hours: 32%
N8123V 100-hour: about Dec 1, 2026
Also due: N744PS 100-hour: about Nov 30, 2026
Also due: N744PS Annual: due by Nov 30, 2026
N8123V share of fleet hours: 32%

Facts from your data, not a diagnosis.

  • N8123V: 100-hour (about Dec 1, 2026); it flies about 28.6 tach hours a month, and flew 32% of the fleet's hours from 2026-07-23 to 2026-10-20. main factor
    N8123V hours per month: 28.6 h/month
    N8123V share of fleet hours: 32%
  • Also due within 14 days: N744PS's 100-hour (about Nov 30, 2026) and N744PS's annual (due by Nov 30, 2026). smaller factor
    Other aircraft due in the same weeks: 1
est Includes estimated values: inferred bills, placeholder fixed costs or allocated fuel. Figures for cancellations, downtime and unbilled ground sessions are estimates by design.