Demo Flight AcademyDemo Flight Academy

Demo school. A sample flight school with four aircraft and two years of invented flights and bills (September 2024–August 2026). Sign in to see your own school's numbers.

Dashboard

September 2026

Sep 1, 2026 – Sep 30, 2026
No flights or transactions in this range.
Revenue
$0
−100%vs. previous period
Operating cost
$3,845est
−87%vs. previous period
Operating margin
−$3,845est
−118%vs. previous period
Utilization
0.0%
−19 ptsvs. previous period
Hours flown
0.0
−100%vs. previous period

Revenue

$260,7106-month total+42%vs. the 6 months before

Apr–Sep, by calendar month.

Utilization

16.5%6-month average+5 ptsvs. the 6 months before

Apr–Sep, by calendar month. Based on your weekly schedule.

What the numbers show

View all
  • N4521KOperating margin fell compared with the previous period, mostly on N4521K.−$25,229

    Operating margin fell compared with the previous period, mostly on N4521K.

    N4521K−$25,229 est

    It went from $21,384 to -$3,845; the largest part was less revenue per hour.

    Ideas schools in this spot often explore

    • Discounts, packages, or a change in the mix of dual and rental flying that move revenue per hour.
    • The bills behind the cost line that moved most, and whether they're one-off.
    • Which months in the period drove the change, and whether it repeats each year.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    The fleet's operating margin was -$3,845, down $25,229 from $21,384 in the previous period (Aug 2026); N4521K accounts for $12,319 of that change.

    Operating margin: -$3,845
    Previous period: $21,384
    N4521K change: -$12,319
    Operating margin: -$3,845
    Previous period: $21,384
    N4521K change: -$12,319

    Facts from your data, not a diagnosis.

    • Revenue fell from $21,331 to $0, costing $21,331. main factor
      Revenue: $0
      Revenue, previous period: $21,331
      Revenue effect: -$21,331
    • Fuel cost fell from $6,207 to $0, adding $6,207. main factor
      Fuel: $0
      Fuel, previous period: $6,207
      Fuel effect: $6,207
    • Maintenance cost fell from $2,805 to $0, adding $2,805. smaller factor
      Maintenance: $0
      Maintenance, previous period: $2,805
      Maintenance effect: $2,805
    • Other changes: +$0. smaller factor
      Other changes: $0
      Total change: -$12,319
  • —A customer is still flying with an overdue balance.$1,097

    A customer is still flying with an overdue balance.

    $1,097 overdue

    They have about $1,097 on invoices more than 30 days past due, and booked flights after the due date.

    Ideas schools in this spot often explore

    • A rule that bookings need the account current, or a card on file charged after each flight.
    • How overdue balances are followed up, and how soon after the due date.
    • Prepaid blocks of hours for regular customers, so flying is paid ahead.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    Student 2 has $1,097 on 4 invoices more than 30 days past due (the oldest due Jul 20, 2026) and flew 20 times since.

    Student 2 overdue: $1,097
    Student 2 flights since the due date: 20
    Student 2 overdue: $1,097
    Student 2 flights since the due date: 20
  • N744PSN744PS's engine is getting close to overhaul.$84,000

    N744PS's engine is getting close to overhaul.

    N744PS$84,000 est Overhaul cost

    With 100.0 tach hours left at the pace it usually flies through the seasons, it's projected for April 2027, at about $84,000 (your setting).

    Ideas schools in this spot often explore

    • Overhaul quotes and shop slots, since lead times can be long.
    • How the overhaul will be paid for (reserve, financing or cash) and when the money is needed.
    • Overhaul, exchange or a factory engine: what each costs, and how long the aircraft would be down.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    N744PS's engine is projected to reach its 2,000-hour TBO about April 2027 (100.0 tach hours remaining at about 18.5 a month, through the seasons).

    Hours remaining to TBO: 100.0 h
    Tach hours per month: 18.5 h/month
    Projected overhaul: April 2027
    Overhaul cost: $84,000
    Hours remaining to TBO: 100.0 h
    Tach hours per month: 18.5 h/month
    Projected overhaul: April 2027
    Overhaul cost: $84,000

    Facts from your data, not a diagnosis.

    • N744PS: 100.0 tach hours remaining to TBO (2,000 less 1,900.0 since overhaul), at about 18.5 tach hours a month, month by month as it flew from 2025-10-01 to 2026-09-30, × 0.72 for its recent trend: about April 2027. main factor
      Hours remaining to TBO: 100.0 h
      Tach hours per month: 18.5 h/month
  • —Students who stop flying tend to stop at 10–20 hours.$31,961

    Students who stop flying tend to stop at 10–20 hours.

    $31,961 est revenue after that point

    4 of the students who stopped flying stopped there; students who get past it bring in about $7,990 each over their next 30 hours of flying.

    Ideas schools in this spot often explore

    • What students meet at that point in training: the first solo, a stage check, the written test, or the cost so far.
    • A check-in with students as they near that point, before they've stopped booking.
    • Whether students who stopped there had gaps between lessons beforehand, and how long.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    4 of the 8 students who stopped flying (60 days or more without a booking, after 3 or more lessons) stopped between 10–20 hours flown (50%). Students who flew past 20 hours brought in a median of $7,990 over their next 30 hours.

    Students who stopped: 8
    Stopped in the band: 4
    Band, hours flown: 10–20 hours
    Share in the band: 50%
    Median revenue after 20 hours: $7,990
    Students past the band: 11
    1 more
    Who: Student 14, Student 15, Student 16, Student 18
    Students who stopped: 8
    Stopped in the band: 4
    Band, hours flown: 10–20 hours
    Share in the band: 50%
    Median revenue after 20 hours: $7,990
    Students past the band: 11
    Who: Student 14, Student 15, Student 16, Student 18
  • —Students who were flying regularly have stopped booking.$24,392

    Students who were flying regularly have stopped booking.

    $24,392 est Their average monthly revenue

    8 students with regular lessons haven't booked for 14 days or more, about $24,392 a month of revenue between them.

    Ideas schools in this spot often explore

    • Whether the aircraft type most of them last flew was often unavailable, or a step up from what they trained in.
    • A personal check-in with each student: schedule, money, motivation, or instructor fit.
    • Booking the next lesson before the student leaves the current one.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    8 students with at least 3 lessons in the 60 days to 2026-09-30 have had no booking for 14 days or more: Student 1 (30 days), Student 3 (32 days), Student 5 (32 days), Student 7 (30 days), Student 8 (31 days), Student 9 (30 days), Student 10 (31 days), Student 11 (30 days).

    Students: 8
    Student 1: days since last booking: 30
    Student 3: days since last booking: 32
    Student 5: days since last booking: 32
    Student 7: days since last booking: 30
    Student 8: days since last booking: 31
    4 more
    Student 9: days since last booking: 30
    Student 10: days since last booking: 31
    Student 11: days since last booking: 30
    Average monthly revenue, together: $24,392
    Students: 8
    Student 1: days since last booking: 30
    Student 3: days since last booking: 32
    Student 5: days since last booking: 32
    Student 7: days since last booking: 30
    Student 8: days since last booking: 31
    Student 9: days since last booking: 30
    Student 10: days since last booking: 31
    Student 11: days since last booking: 30
    Average monthly revenue, together: $24,392

    Facts from your data, not a diagnosis.

    • 5 of the 8 students last flew a Piper PA-28-181 Archer III. smaller factor
      Last flight in a Piper PA-28-181 Archer III: 5
      Students: 8
  • N744PSN744PS's costs have risen faster than its rate.$19,688

    N744PS's costs have risen faster than its rate.

    N744PS$19,688 est cost rise not in the rate

    Since its rate last changed, its cost per hour has gone from about $255 to $304, about $19,688 over the hours flown since.

    Ideas schools in this spot often explore

    • Whether fuel prices or fuel burn per hour account for the rise.
    • When the lease terms changed, and whether the rate was reviewed then.
    • When the hourly rate was last reviewed against its cost per hour.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    N744PS's hourly rate last changed in September 2025 (from $375.00 to $395.00 on its invoices). Its operating cost per hour has gone from $254.62 (the 12 months before September 2025) to $303.79 (the 12 months to Sep 30, 2026), up 19%; over the 400.4 hours flown since, that's about $19,688.

    Hourly rate: $395.00/hr
    Rate last changed: September 2025
    Cost per hour before: $254.62/hr
    Cost per hour, 12 months to now: $303.79/hr
    Hours flown since: 400.4 h
    Hourly rate: $395.00/hr
    Rate last changed: September 2025
    Cost per hour before: $254.62/hr
    Cost per hour, 12 months to now: $303.79/hr
    Hours flown since: 400.4 h

    Facts from your data, not a diagnosis.

    • Fuel went from $87.90 to $111.82 per hour flown. main factor
      Fuel per hour, before: $87.90/hr
      Fuel per hour, now: $111.82/hr
    • Lease payments went from $83.12 to $97.26 per hour flown. smaller factor
      Lease payments per hour, before: $83.12/hr
      Lease payments per hour, now: $97.26/hr
    • Insurance went from $25.24 to $31.50 per hour flown. smaller factor
      Insurance per hour, before: $25.24/hr
      Insurance per hour, now: $31.50/hr
  • N8123VN8123V loses money once its owner is paid.$790

    N8123V loses money once its owner is paid.

    N8123V$790 est net after owner payout

    After its operating costs and the owner's payout under the agreement, the school was about $790 behind on N8123V in this period.

    Ideas schools in this spot often explore

    • How the costs the school carries on the leaseback (insurance, hangar, maintenance) are split with the owner in the agreement.
    • Whether the leaseback agreement's payout terms still fit what the aircraft earns and costs to run.
    • Which months' owner payouts differ from the agreement, and whether a payment was missed, doubled, or paid on old terms.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    At $22 per Hobbs hour, N8123V's owner was owed $0 for 0.0 hours; the books show $0 paid. After that payout and its operating cost of $790, the school's net on N8123V was -$790.

    N8123V payout owed: $0
    N8123V payout booked: $0
    N8123V revenue: $0
    N8123V operating cost before payout: $790
    N8123V net after payout: -$790
    N8123V payout owed: $0
    N8123V payout booked: $0
    N8123V revenue: $0
    N8123V operating cost before payout: $790
    N8123V net after payout: -$790
  • N8123VN8123V's fuel cost per hour went up.

    N8123V's fuel cost per hour went up.

    It rose 18% against the three months before.

    Ideas schools in this spot often explore

    • Where fuel is purchased and at what price: contract pricing, self-serve against full-serve, and fuel-card fees.
    • Leaning and run-up procedures in the syllabus, and whether they're followed consistently.
    • Whether the hourly rate or a fuel surcharge moves with fuel prices.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    N8123V's fuel cost per Hobbs hour was $74.41 in Jul–Sep 2026, up 18% from $63.31 in Apr–Jun 2026, against a fleet-wide rise of 0%, with under 3 months of flying in a window, so it isn't priced.

    Fuel per hour, Jul–Sep 2026: $74.41/hr
    Fuel per hour, Apr–Jun 2026: $63.31/hr
    Rise: 18%
    Fleet-wide change: 0%
    Hours flown this period: 0.0 h
    Fuel per hour, Jul–Sep 2026: $74.41/hr
    Fuel per hour, Apr–Jun 2026: $63.31/hr
    Rise: 18%
    Fleet-wide change: 0%
    Hours flown this period: 0.0 h
  • N8123V, N744PS +13 aircraft are due for inspection in the same two weeks.

    3 aircraft are due for inspection in the same two weeks.

    Together they flew 99% of the fleet's hours, so having them down at once would leave the schedule short.

    Ideas schools in this spot often explore

    • Bringing one inspection forward a few days so the aircraft aren't down at the same time.
    • Whether the shop can take two aircraft in the same week, and how long each would take.
    • Which bookings fall in those weeks and could move to other aircraft.

    Ideas, not recommendations. Your situation may differ.

    Show the numbers

    N8123V's 100-hour inspection (about Oct 27, 2026), N744PS's 100-hour inspection (about Oct 28, 2026) and N4521K's 100-hour inspection (about Nov 5, 2026) are projected within 14 days of each other; together these aircraft flew 98% of the fleet's hours from 2026-07-03 to 2026-09-30.

    N8123V 100-hour: about Oct 27, 2026
    N744PS 100-hour: about Oct 28, 2026
    N4521K 100-hour: about Nov 5, 2026
    N8123V share of fleet hours: 33%
    N744PS share of fleet hours: 18%
    N4521K share of fleet hours: 48%
    N8123V 100-hour: about Oct 27, 2026
    N744PS 100-hour: about Oct 28, 2026
    N4521K 100-hour: about Nov 5, 2026
    N8123V share of fleet hours: 33%
    N744PS share of fleet hours: 18%
    N4521K share of fleet hours: 48%

    Facts from your data, not a diagnosis.

    • Together N8123V, N744PS and N4521K flew 98% of the fleet's hours from 2026-07-03 to 2026-09-30. main factor
      Share of fleet hours: 98%
    • N8123V: 100-hour about Oct 27, 2026; 35.7 tach hours a month, 33% of the fleet's hours. smaller factor
      N8123V hours per month: 35.7 h/month
      N8123V share of fleet hours: 33%
    • N744PS: 100-hour about Oct 28, 2026; 18.5 tach hours a month, 18% of the fleet's hours. smaller factor
      N744PS hours per month: 18.5 h/month
      N744PS share of fleet hours: 18%
    • N4521K: 100-hour about Nov 5, 2026; 46.4 tach hours a month, 48% of the fleet's hours. main factor
      N4521K hours per month: 46.4 h/month
      N4521K share of fleet hours: 48%

Aircraft

Active
Inactive
Due soon
Total aircraft
N4521KCessna 172S SkyhawkActive0.0 hrs
N6047QCessna 152Active0.0 hrs
N744PSPiper PA-44-180 SeminoleActive0.0 hrs
N8123VPiper PA-28-181 Archer IIIActive0.0 hrs

Aircraft, ranked by operating margin

#TailTypeProfit/hrHours flownUtilization
Based on your weekly schedule.
RevenueOperating costOperating marginLoan paymentsAfter loan payments
Cash view: includes loan principal
Revenue/hrCost/hr
4N744PSestPiper PA-44-180 Seminole—0.00.0%$0−$1,600−$1,600$0−$1,600——
3N4521KestCessna 172S Skyhawk—0.00.0%$0−$875−$875−$1,150−$2,025——
2N8123VestPiper PA-28-181 Archer III—0.00.0%$0−$790−$790$0−$790——
1N6047QestCessna 152—0.00.0%$0−$580−$580$0−$580——
Fleet total—0.00.0%$0−$3,845est−$3,845est−$1,150est−$4,995est——
est Includes estimated values: inferred bills, placeholder fixed costs or allocated fuel.Expenses are shown with a minus sign.

What the numbers show

Operating margin fell compared with the previous period, mostly on N4521K.

N4521K−$25,229 est

It went from $21,384 to -$3,845; the largest part was less revenue per hour.

Ideas schools in this spot often explore

  • Discounts, packages, or a change in the mix of dual and rental flying that move revenue per hour.
  • The bills behind the cost line that moved most, and whether they're one-off.
  • Which months in the period drove the change, and whether it repeats each year.

Ideas, not recommendations. Your situation may differ.

Show the numbers

The fleet's operating margin was -$3,845, down $25,229 from $21,384 in the previous period (Aug 2026); N4521K accounts for $12,319 of that change.

Operating margin: -$3,845
Previous period: $21,384
N4521K change: -$12,319
Operating margin: -$3,845
Previous period: $21,384
N4521K change: -$12,319

Facts from your data, not a diagnosis.

  • Revenue fell from $21,331 to $0, costing $21,331. main factor
    Revenue: $0
    Revenue, previous period: $21,331
    Revenue effect: -$21,331
  • Fuel cost fell from $6,207 to $0, adding $6,207. main factor
    Fuel: $0
    Fuel, previous period: $6,207
    Fuel effect: $6,207
  • Maintenance cost fell from $2,805 to $0, adding $2,805. smaller factor
    Maintenance: $0
    Maintenance, previous period: $2,805
    Maintenance effect: $2,805
  • Other changes: +$0. smaller factor
    Other changes: $0
    Total change: -$12,319

A customer is still flying with an overdue balance.

$1,097 overdue

They have about $1,097 on invoices more than 30 days past due, and booked flights after the due date.

Ideas schools in this spot often explore

  • A rule that bookings need the account current, or a card on file charged after each flight.
  • How overdue balances are followed up, and how soon after the due date.
  • Prepaid blocks of hours for regular customers, so flying is paid ahead.

Ideas, not recommendations. Your situation may differ.

Show the numbers

Student 2 has $1,097 on 4 invoices more than 30 days past due (the oldest due Jul 20, 2026) and flew 20 times since.

Student 2 overdue: $1,097
Student 2 flights since the due date: 20
Student 2 overdue: $1,097
Student 2 flights since the due date: 20

N744PS's engine is getting close to overhaul.

N744PS$84,000 est Overhaul cost

With 100.0 tach hours left at the pace it usually flies through the seasons, it's projected for April 2027, at about $84,000 (your setting).

Ideas schools in this spot often explore

  • Overhaul quotes and shop slots, since lead times can be long.
  • How the overhaul will be paid for (reserve, financing or cash) and when the money is needed.
  • Overhaul, exchange or a factory engine: what each costs, and how long the aircraft would be down.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N744PS's engine is projected to reach its 2,000-hour TBO about April 2027 (100.0 tach hours remaining at about 18.5 a month, through the seasons).

Hours remaining to TBO: 100.0 h
Tach hours per month: 18.5 h/month
Projected overhaul: April 2027
Overhaul cost: $84,000
Hours remaining to TBO: 100.0 h
Tach hours per month: 18.5 h/month
Projected overhaul: April 2027
Overhaul cost: $84,000

Facts from your data, not a diagnosis.

  • N744PS: 100.0 tach hours remaining to TBO (2,000 less 1,900.0 since overhaul), at about 18.5 tach hours a month, month by month as it flew from 2025-10-01 to 2026-09-30, × 0.72 for its recent trend: about April 2027. main factor
    Hours remaining to TBO: 100.0 h
    Tach hours per month: 18.5 h/month

Students who stop flying tend to stop at 10–20 hours.

$31,961 est revenue after that point

4 of the students who stopped flying stopped there; students who get past it bring in about $7,990 each over their next 30 hours of flying.

Ideas schools in this spot often explore

  • What students meet at that point in training: the first solo, a stage check, the written test, or the cost so far.
  • A check-in with students as they near that point, before they've stopped booking.
  • Whether students who stopped there had gaps between lessons beforehand, and how long.

Ideas, not recommendations. Your situation may differ.

Show the numbers

4 of the 8 students who stopped flying (60 days or more without a booking, after 3 or more lessons) stopped between 10–20 hours flown (50%). Students who flew past 20 hours brought in a median of $7,990 over their next 30 hours.

Students who stopped: 8
Stopped in the band: 4
Band, hours flown: 10–20 hours
Share in the band: 50%
Median revenue after 20 hours: $7,990
Students past the band: 11
1 more
Who: Student 14, Student 15, Student 16, Student 18
Students who stopped: 8
Stopped in the band: 4
Band, hours flown: 10–20 hours
Share in the band: 50%
Median revenue after 20 hours: $7,990
Students past the band: 11
Who: Student 14, Student 15, Student 16, Student 18

Students who were flying regularly have stopped booking.

$24,392 est Their average monthly revenue

8 students with regular lessons haven't booked for 14 days or more, about $24,392 a month of revenue between them.

Ideas schools in this spot often explore

  • Whether the aircraft type most of them last flew was often unavailable, or a step up from what they trained in.
  • A personal check-in with each student: schedule, money, motivation, or instructor fit.
  • Booking the next lesson before the student leaves the current one.

Ideas, not recommendations. Your situation may differ.

Show the numbers

8 students with at least 3 lessons in the 60 days to 2026-09-30 have had no booking for 14 days or more: Student 1 (30 days), Student 3 (32 days), Student 5 (32 days), Student 7 (30 days), Student 8 (31 days), Student 9 (30 days), Student 10 (31 days), Student 11 (30 days).

Students: 8
Student 1: days since last booking: 30
Student 3: days since last booking: 32
Student 5: days since last booking: 32
Student 7: days since last booking: 30
Student 8: days since last booking: 31
4 more
Student 9: days since last booking: 30
Student 10: days since last booking: 31
Student 11: days since last booking: 30
Average monthly revenue, together: $24,392
Students: 8
Student 1: days since last booking: 30
Student 3: days since last booking: 32
Student 5: days since last booking: 32
Student 7: days since last booking: 30
Student 8: days since last booking: 31
Student 9: days since last booking: 30
Student 10: days since last booking: 31
Student 11: days since last booking: 30
Average monthly revenue, together: $24,392

Facts from your data, not a diagnosis.

  • 5 of the 8 students last flew a Piper PA-28-181 Archer III. smaller factor
    Last flight in a Piper PA-28-181 Archer III: 5
    Students: 8

N744PS's costs have risen faster than its rate.

N744PS$19,688 est cost rise not in the rate

Since its rate last changed, its cost per hour has gone from about $255 to $304, about $19,688 over the hours flown since.

Ideas schools in this spot often explore

  • Whether fuel prices or fuel burn per hour account for the rise.
  • When the lease terms changed, and whether the rate was reviewed then.
  • When the hourly rate was last reviewed against its cost per hour.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N744PS's hourly rate last changed in September 2025 (from $375.00 to $395.00 on its invoices). Its operating cost per hour has gone from $254.62 (the 12 months before September 2025) to $303.79 (the 12 months to Sep 30, 2026), up 19%; over the 400.4 hours flown since, that's about $19,688.

Hourly rate: $395.00/hr
Rate last changed: September 2025
Cost per hour before: $254.62/hr
Cost per hour, 12 months to now: $303.79/hr
Hours flown since: 400.4 h
Hourly rate: $395.00/hr
Rate last changed: September 2025
Cost per hour before: $254.62/hr
Cost per hour, 12 months to now: $303.79/hr
Hours flown since: 400.4 h

Facts from your data, not a diagnosis.

  • Fuel went from $87.90 to $111.82 per hour flown. main factor
    Fuel per hour, before: $87.90/hr
    Fuel per hour, now: $111.82/hr
  • Lease payments went from $83.12 to $97.26 per hour flown. smaller factor
    Lease payments per hour, before: $83.12/hr
    Lease payments per hour, now: $97.26/hr
  • Insurance went from $25.24 to $31.50 per hour flown. smaller factor
    Insurance per hour, before: $25.24/hr
    Insurance per hour, now: $31.50/hr

N8123V loses money once its owner is paid.

N8123V$790 est net after owner payout

After its operating costs and the owner's payout under the agreement, the school was about $790 behind on N8123V in this period.

Ideas schools in this spot often explore

  • How the costs the school carries on the leaseback (insurance, hangar, maintenance) are split with the owner in the agreement.
  • Whether the leaseback agreement's payout terms still fit what the aircraft earns and costs to run.
  • Which months' owner payouts differ from the agreement, and whether a payment was missed, doubled, or paid on old terms.

Ideas, not recommendations. Your situation may differ.

Show the numbers

At $22 per Hobbs hour, N8123V's owner was owed $0 for 0.0 hours; the books show $0 paid. After that payout and its operating cost of $790, the school's net on N8123V was -$790.

N8123V payout owed: $0
N8123V payout booked: $0
N8123V revenue: $0
N8123V operating cost before payout: $790
N8123V net after payout: -$790
N8123V payout owed: $0
N8123V payout booked: $0
N8123V revenue: $0
N8123V operating cost before payout: $790
N8123V net after payout: -$790

N8123V's fuel cost per hour went up.

It rose 18% against the three months before.

Ideas schools in this spot often explore

  • Where fuel is purchased and at what price: contract pricing, self-serve against full-serve, and fuel-card fees.
  • Leaning and run-up procedures in the syllabus, and whether they're followed consistently.
  • Whether the hourly rate or a fuel surcharge moves with fuel prices.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N8123V's fuel cost per Hobbs hour was $74.41 in Jul–Sep 2026, up 18% from $63.31 in Apr–Jun 2026, against a fleet-wide rise of 0%, with under 3 months of flying in a window, so it isn't priced.

Fuel per hour, Jul–Sep 2026: $74.41/hr
Fuel per hour, Apr–Jun 2026: $63.31/hr
Rise: 18%
Fleet-wide change: 0%
Hours flown this period: 0.0 h
Fuel per hour, Jul–Sep 2026: $74.41/hr
Fuel per hour, Apr–Jun 2026: $63.31/hr
Rise: 18%
Fleet-wide change: 0%
Hours flown this period: 0.0 h

3 aircraft are due for inspection in the same two weeks.

Together they flew 99% of the fleet's hours, so having them down at once would leave the schedule short.

Ideas schools in this spot often explore

  • Bringing one inspection forward a few days so the aircraft aren't down at the same time.
  • Whether the shop can take two aircraft in the same week, and how long each would take.
  • Which bookings fall in those weeks and could move to other aircraft.

Ideas, not recommendations. Your situation may differ.

Show the numbers

N8123V's 100-hour inspection (about Oct 27, 2026), N744PS's 100-hour inspection (about Oct 28, 2026) and N4521K's 100-hour inspection (about Nov 5, 2026) are projected within 14 days of each other; together these aircraft flew 98% of the fleet's hours from 2026-07-03 to 2026-09-30.

N8123V 100-hour: about Oct 27, 2026
N744PS 100-hour: about Oct 28, 2026
N4521K 100-hour: about Nov 5, 2026
N8123V share of fleet hours: 33%
N744PS share of fleet hours: 18%
N4521K share of fleet hours: 48%
N8123V 100-hour: about Oct 27, 2026
N744PS 100-hour: about Oct 28, 2026
N4521K 100-hour: about Nov 5, 2026
N8123V share of fleet hours: 33%
N744PS share of fleet hours: 18%
N4521K share of fleet hours: 48%

Facts from your data, not a diagnosis.

  • Together N8123V, N744PS and N4521K flew 98% of the fleet's hours from 2026-07-03 to 2026-09-30. main factor
    Share of fleet hours: 98%
  • N8123V: 100-hour about Oct 27, 2026; 35.7 tach hours a month, 33% of the fleet's hours. smaller factor
    N8123V hours per month: 35.7 h/month
    N8123V share of fleet hours: 33%
  • N744PS: 100-hour about Oct 28, 2026; 18.5 tach hours a month, 18% of the fleet's hours. smaller factor
    N744PS hours per month: 18.5 h/month
    N744PS share of fleet hours: 18%
  • N4521K: 100-hour about Nov 5, 2026; 46.4 tach hours a month, 48% of the fleet's hours. main factor
    N4521K hours per month: 46.4 h/month
    N4521K share of fleet hours: 48%

Not in your data: gallons on fuel bills. The cards leave out what depends on them.

est Includes estimated values: inferred bills, placeholder fixed costs or allocated fuel. Figures for cancellations, downtime and unbilled ground sessions are estimates by design.

School

Aircraft operating margin−$3,845est
School-level revenue
Instruction$0
Ground instruction$0
Other revenue$0
Shared overhead$0
Operating result−$3,845est
Aircraft loans−$1,150est
Net after loan payments
Cash view: includes loan principal
−$4,995est

Summary

Built from the numbers above. Signed-in schools also get a summary written by AI.

September 2026: no aircraft flew.

  • Operating margin was down $25,229 on the previous period, $12,319 of it on N4521K.
  • A customer kept flying with about $1,097 more than 30 days overdue.
  • N744PS's engine is projected to reach overhaul about April 2027; overhaul cost $84,000 (your setting).

Data gaps: not recorded in your data: gallons on fuel bills.

Students & instructors

No booking in this range names an instructor or a student.

Lessons and flights by type

Dual hrsSolo hrsRental hrsGround hrs
School0.00.00.00.0

Instruction revenue: flight instruction $0, ground instruction $0. Flight hours are Hobbs time; ground hours are booked time.

Where students stop flying

8 students stopped flying in the 12 months to 2026-09-30: no booking for 60 days or more, after 3 or more lessons. Hours flown when they stopped (Hobbs).

Hours flown when they stopped

When the schedule is full

No aircraft had enough bookings in this range to show.